System Requirements Review: September 2, 2009 The SRR examines the functional and performance requirements defined for the system and the preliminary program or project plan and ensures that the requirements and the selected concept will satisfy the mission. (Cited fromNASA Procedural Requirements) View more presentations from Elnath0412.
Mission Concept Review: September 21, 2009 The MCR affirms the mission need and examines the proposed mission's objectives and the concept for meeting those objectives. (Cited from NASA Procedural Requirements) MCR: USLI 2009-2010, UAHuntsville View more presentations from Elnath0412. Back to Top Critical Design Review: November 23, 2009 The CDR demonstrates that the maturity of the design is appropriate to support proceeding with full-scale fabrication, assembly, integration, and test. CDR determines that the technical effort is on track to complete the flight and ground system development and mission operations, meeting mission performance requirements within the identified cost and schedule constraints. (Cited from NASA Procedural Requirements) To Be Posted Back to Top Flight Readiness Review: TBA The FRR examines tests, demonstrations, analyses, and audits that determine the system?s readiness for a safe and successful flight or launch and for subsequent flight operations. It also ensures that all flight and ground hardware, software, personnel, and procedures are operationally ready. (Cited from NASA Procedural Requirements) To Be Posted Back to Top |