Rocket‎ > ‎

Launches

HARA Launch
Date: September 5, 2009
Location: Manchester, TN
Launch Duty: HARA

The entire team attended a HARA launch to support Paul and Leslie as the went for their NAR Level 2 Certifications.
 
Both rockets were 1/4 scale Patriots with dual deploy recovery systems, and apogee was around 2500 feet for both. Paul launched his rocket on an Aerotech J350W. Leslie launched her rocket on an Aerotech J500G.
 

     Videos: 1 2

Subscale Launch
Date: November 14, 2009
Location: Childersburg, AL
Launch Duty: Phoenix Missile Works

Our sub-scale launch will take place later this fall.